Foundation Preparation:Before laying the rubber mat roll for floor,it is necessary to ensure that the concrete foundation is level,dry,oil-free,and free of debris.If necessary,the foundation can be treated,such as repairing cracks and filling potholes.
Adhesive Selection:When laying the rubber mat roll for floor on the concrete foundation,a suitable adhesive is usually needed.Based on the characteristics of the rubber mat roll for floor and the concrete foundation,the appropriate adhesive should be selected to ensure good adhesion.
Adhesion Process:Before laying the rubber mat roll for floor,the adhesive should be evenly applied on the concrete foundation.Then,the rubber mat roll for floor should be placed on the adhesive and ensured to have full contact and adhesion with the foundation.A rolling tool or heavy object can be used to ensure the tight adhesion of the rubber mat roll for floor to the foundation as needed.
Attention to Drainage:When laying the rubber mat roll for floor,it is necessary to ensure that the concrete foundation has good drainage performance to prevent water from accumulating under the rubber mat roll for floor.Proper drainage can extend the service life of the rubber mat roll for floor.
Click to know Floor Mat Rubber Rolls